description != null):?> keywords != null):?> Tableware Manufacturer | Highland Group Live (new)

Tableware Manufacturer

NEEDS-BASED RESULTS

 

Tableware Manufacturer

SITUATION

A manufacturer of stainless tableware desired to improve customer delivery while reducing manufacturing costs to compete in a developing world market.

DRIVER GOAL

  • Improve delivery performance to 97% by year end.
  • Increase throughput 10% by year end.
  • Reduce scrap levels 15% by year end.

RESULT

  • Achieved 97% delivery performance.
  • Increased machine up-time by more than 10%.
  • Reduced scrap by 20%.
case study image

Case Study

Optimize Throughput & Improve Cost Performance

Issue

A manufacturer of stainless tableware desired to improve customer delivery while reducing manufacturing costs to compete in a developing world market.

Highland Approach

The Highland Group engaged cross-functional teams to address chronic manufacturing issues, improve quality and throughput, and cut costs. A refined maintenance system improved equipment up-time, eliminating bottle necks, and a reorganized MRP (materials resource planning) system improved workflow and overall productivity.

Actions Taken

  • Addressed manufacturing problems with process reengineering teams that included machine operators, quality personnel and engineering.
  • Designed and implemented a structured System For Managing throughout the plant.
  • Delineated requirements for the maintenance system and implemented the optimized system.
  • Organized MRP system requirements and directed the implementation.
  • Trained management and supervisory staff in the use of selected systems.

Improved throughput by

10%

with an associated reduction in cost

Related Information

subject matter-based